Main Gate Complex
- Home
- portfolio
- Architecture
- Commercial
- Main Gate Complex



Main Gate Complex
Date
March 2027
Location
Akaltara, Chhattisgarh
Value
₹2.5 Cr.
Client
JSW Mahanadi Power Ltd.
Category
Civil Works
A modern industrial entry/exit Gate Complex. The design features a large, clear-span steel space truss that bridges over multi-lane vehicle checkpoints and connects two single-story administrative buildings.
Our Solutions
The facility is split into two primary zones to manage incoming and outgoing traffic efficiently:
- Left Side (Entrance Zone):
- Ground Floor: Features the primary reception desk, a security gate pass counter, security control rooms, and a dedicated data server room.
- Traffic Lanes: Includes a narrow dedicated lane for two-wheelers and a wide primary entry lane for trucks and larger vehicles.
- Center (Control Hub):
- A localized central post for trucks sits between the lanes to inspect high-clearance vehicles directly. An integrated staircase provides secure service access directly up to the overhead truss mechanism.
- A localized central post for trucks sits between the lanes to inspect high-clearance vehicles directly. An integrated staircase provides secure service access directly up to the overhead truss mechanism.
- Right Side (Exit Zone):
- Ground Floor: Houses a visitor waiting area, an exit gate pass verification counter, and an independent security stations
- Traffic Lanes: Mirrors the entrance with a wide exit lane and a separate two-wheeler exit passage.